The fixed crane is a very easy to use equipment, it is a kind of fixed equipment, need to carry out a lot of high load work, so the position of the device and the firmness of the device are very important, and every day before the formal use, also need to check the condition of the equipment, to ensure that everything is normal before you can start operation Use.
For example, the first thing is to check the bearing temperature, which is very important in the inspection work, and it is also the reason why the empty machine operation and load operation of the wharf fixed crane before leaving the factory add up to more than 10 hours, in order to measure the temperature of the bearing after a long time of use. If the temperature exceeds 80 degrees, the machine will not work It should be overhauled directly.
There is also a way to observe the use of the crane, that is, listen to the sound of the machine when it is running, whether it is regular, whether it conforms to the corresponding power of the electric, if the sound is too loud, too much noise, abnormal noise and so on, the stability of the machine is greatly reduced, and corresponding treatment is needed.
All kinds of inspection should be done before using the fixed crane
After carrying out these inspections, if the fixed crane at the wharf is as usual, then people can safely open it for use, which will bring a very efficient effect for the handling of all kinds of goods in the wharf.
Large marine floating crane is a kind of capable but fragile industrial machinery, its role is very important, in many places are irreplaceable production helper, but at the same time, its machine device, operation requirements are also high, users need to make strict operation, in order to ensure the operation effect of the whole machine.
The operators of this machine must be professional, and they must have received special operation training and obtained the corresponding operation certificate before they can work. At the same time, in addition to the use of machinery, they also need to learn the corresponding maintenance and repair skills, so as to better ensure the function of the machine.
For example, it is very necessary to do the startup inspection. Before opening the large marine floating crane, it is necessary to conduct a comprehensive startup inspection, clean the inside and outside of the machine, ensure the horizontal state of the water basin, check whether each connection port is firm, whether the screws are loose, and so on. At the same time, it is necessary to check whether the lubrication is in place, and whether the oil in the oil tank is sufficient.
We should also pay attention to the hook and cable conditions of large marine floating crane, and ensure that these positions which are easy to be stretched and worn are not over aged before it can be officially put into use. If serious wear has been found, which may affect the use, it should be replaced immediately.
Product Center: Shiploader, Unloader, Gantry crane, Fixed crane, Tyre crane, Mobile screw unloader manufacturers
Screw unloader manufacturer, Rail loader, Belt conveyor, Hopper, Grab, Barge, Non-standard metal structure
Scan Learn more about the industry |
Service Hotline: 139-6185-1566
Fax: 0510-68793150
Contact Person: Mr. Yu
Email: 13961851566@163.com
Address: No. 12 Tianshun Road, Yangshan industrial supporting zone, Wuxi City
Website: www.ye-jx.com